• Sourcing Solutions
  • Services & Membership
  • Help & Community

Quick Details

  • Place of Origin: Liaoning, China (Mainland)
  • Brand Name: SYLY
  • Model Number: prefab houses
  • Material: Sandwich Panel
  • Use: Carport, House, Kiosk,Booth, Office, Sentry Box,Guard House, Shop, Toilet, Villa, Warehouse, Workshop,Plant
  • material: color steel
  • size: as customers request
  • type: precabricated house kits
  • function: office building, dormitory, canteen, washing room, etc.

Packaging & Delivery

Packaging Details portable house export with hooks for easy unloading of material with bundle weight.
Delivery Time within 15-20 days
Product Description

China good design and cheap price small prefab houses / portable houses

1). All steel fabric parts and the size of portable house can be made according to clients' requirement:
2). The portable house is low cost, durable structure, convenient relocation, and environment-protection,
3). The material of portable house is light and easy to install. It takes 1-3days for five workers to finish the installation of a 50 square meters house.
4). All the materials of portable house can be cycle-used, Meeting the requirements of environment protection in the world. Special is in the large-scale house projects in the developed region.
5). We use high quality galvanized sheet and foam as the materials of walls and roof.So the prefab house is good for fireproofing, waterproofing, etc
6). Support frame system of steel portable house: Q235B China stander steel structural. Square tube, Channel steel, etc

Design capability

By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (Xsteel) and etc. we can design different portable houses according to customers' requirements

Our Strengths
Related Products
FAQ
1.Q: Could you please design a new and unique portable house for me?
A: Absolutely! We are able to provide you with not only construction scheme, but landscape design! One-stop service is our outstanding superiority with no doubt.

2.Q: What should I provide to build a portable house?
A: So easy! Sketch drawing would be a better reference for us. However, you will never mind if you don’t have any. Simply notify us your requirements, such as the area, usage and the stories of the house. Before long, you’ll possess an amazing design.

3.Q: How could I ensure the cost of building a portable house?
A: Firstly, the designing scheme should be accepted. Then, the kinds of building materials should be confirmed since different types and qualities make various prices. After that, we will send you a detailed quotation.

4.Q: How Long does it take to build a light steel portable house?
A: It depends on the size of the portable houses. Generally, one 50 square meter house five workers 1-3days finished installation, save manpower and time

5.Q: Is it difficult to build a portable house?
A: Totally not, you can build the house independently according to the construction drawings as long as you know how to use an electric tool.

6.Q: Does this kind of house can only be used in residential buildings?
A: Absolutely not. It can be used in all kinds of buildings, such as portable house, hotel, office, school, entertainment club, light industrial workshop, etc.

7.Q: Is portable house stable?
A: Set your hearts at rest! You are completely safe living in light steel prefab house even if there are hurricanes of 200km/h and 9-grade earthquake outside.

8.Q: what are the advantages of prefab house compared to the traditional building?
A: Better isolation of sound and heat, Better fireproof and anti-seismic, Wind resistance, Time and labor saving, More usable area, Excellent termite-proof capability

9.Q: Does prefab house look different from the ordinary one?
A: Yes. prefab house is more beautiful and suitable for any style.

Q10: How do we cooperate on certain project?
Firstly, please send us your project details and your requirements. Then we will design accordingly, free of charge. Afterwards, please check and confirm whether you like the drawings. If not, we shall get the drawings revised until your confirmation. Finally, we make a deal on alibaba.com with Trade Assurance.
Project details ---> Drawings for your project ---> Revised drawings ---> Transaction confirmation with Trade Assurance

Q11: What is the delivery time?
Delivery time depends on order quantities. Generally, the delivery time will be 15-25 days after receiving the deposit.
Price

Basic Design Requirements: design Load: (very important)

1. Snow load:
2. Wind load:
3. Seismic magnitude:
4. Project location:
5. Length (side wall, m):
6. Width (end wall, m):
7. Wall Height (eave, m):
8. The material of the wall panel:
9. The thickness (50-200mm) of wall and ceiling panel(usually we use 75mm):
10. The layout of the portable house:

Transaction History of the Supplier

Below is the information about the supplier's transactions conducted via Alibaba.com. If you require further details regarding the transaction data, please contact the supplier directly.

Transaction Overview

Transactions

Transaction Details

This supplier has completedtransactions with buyers from .

Shipping Destination
Transaction Value
Transaction Date
Email to this supplier
Trade Assurance
China (Mainland) | Manufacturer, Trading Company
Transaction Level:
Supplier Assessments:
The supplier supports Trade Assurance – A free service that protects your orders from payment to delivery.
Supplier's Trade Assurance Limit: US $84,000
Learn More